Projects

Conversion of large Dutch telecom provider

1 min read
Share
PROJECT DETAILS
CLIENT: Telecom provider
CATEGORY: Service & Maintenance

This set from a Dutch telecom provider was installed in 2006 and the control system was due for replacement. The technicians from ABATO took it in hand and modernised it. The emergency generator (NSA) was taken out of service and the control cabinet was subsequently cleared. A new control system was installed and wired. Binary sensors were disconnected. New (control current) cabling was connected and subsequently the NSA was brought back online in parallel operation during the night. The generator was tested in mains-parallel operation and an emergency power test was carried out.

Related articles